Get a Quote

How can we help?

Pick all that apply.

Step 1 of 6

Ask a Question

What's your question?
Step 1 of 4
Driveway Construction

Gravel Driveway Construction in Sylva, NC

We build gravel driveways and mountain roads start to finish: we clear the route, grade a climb your truck can handle, put in culverts so the rain doesn't wash it out, and finish it with gravel spread smooth.

Mountain Driveways That Hold Up

A driveway in these mountains has a lot working against it. It has to climb a hillside, get around rock and springs, and stand up to hard rains that want to run straight down it.

Calvin was born and raised in these mountains and has 10+ years of experience in excavation. He lays out the route with you and builds it with our dozer and mini excavator, and the gravel comes in on our own dump truck.

We build new driveways up to a house site and roads across larger pieces of land. We also fix gravel drives that have washed out or gotten too rough to drive.

Building a home? We can plan the driveway along with your house pad and septic so they all fit together. See our site prep services.

Gravel road curving along a freshly cut red clay bank in the woods
A road cut along the hillside

How We Build a Mountain Driveway

  1. Mini excavator clearing trees along a driveway route
    01

    Clearing and Building the Road

    We start by clearing the route, pushing the trees over roots and all and getting the brush out of the way of the road. On a hillside, we cut into the bank to make room for a road bed that's wide enough to drive and sits on solid ground. If there's an old logging road on your land, we can often open it back up and build on it.

  2. Freshly graded road bed with dozer tracks along a tall cut bank
    02

    Grading for a Climb Your Truck Can Handle

    Next we grade it. We work the slope so it isn't too steep to climb in bad weather, ease the turns, and shape the surface so water runs off the sides instead of down the middle.

  3. Drain culvert in the ditch beside a gravel driveway
    03

    Culverts and Ditches to Keep It From Washing Away

    Water is what ruins a mountain driveway. We dig ditches along the high side and put in drain culverts where water needs to cross under the road, so a heavy rain runs off and away instead of cutting ruts and washing out your gravel.

  4. Dozer smoothing gravel on a new driveway at Tilly Creek in Cullowhee
    04

    Gravel Spread and Smoothed Out

    Last comes the gravel. We haul it in on our dump truck, spread it across the road and smooth it out with the dozer, so you're left with an even surface that's easy on your vehicles.

Let's Build Your Driveway

Call today828-550-9062

“…a wise man, which built his house upon a rock: And the rain descended, and the floods came, and the winds blew, and beat upon that house; and it fell not: for it was founded upon a rock.”

Matthew 7:24–25

Why Folks Around Sylva Call Carolina's Excavating

Almost all of our work has come by word of mouth. We're a husband-and-wife business, so when you call, you're talking to the people who'll be out working on your road.

We carry insurance and we're Level II licensed septic installers. If there's a house going in at the top of the drive, the same company can grade the pad and put in the septic system.

Matthew 7:24–25 is the verse our business is built on, and a driveway is no different from a house: build it on solid ground and it lasts. We treat every customer like family, with straight answers and no broken promises.

From First Call to Your Finished Driveway

  1. Mini excavator, dump truck and dozer lined up on a gravel drive
    01Give us a call

    Call 828-550-9062 or send the quote form. Tell us where the property is and where you'd like the driveway to go.

  2. Mini excavator beside a freshly cut bank
    02We walk the route

    We walk it with you and look at the slope, where the water runs and where the culverts will need to go.

  3. Dozer tracks across freshly graded red clay
    03You get a free written quote

    You'll see the plan and the price in writing before any work starts.

  4. Dump truck delivering a load at a wooded job site
    04We build it

    Clearing, grading, culverts and ditches, then the gravel: we handle every step.

Starting From Raw Land?

Most new driveways lead to a homesite. We can clear the land and get your house pad ready too.

Let's Walk Your Driveway Route

Tell us where the property is and where you want the driveway, and we'll set up a time to come out. You'll have a free written quote in hand before anything begins.

Call today828-550-9062

Frequently Asked Questions

How much does a gravel driveway cost?

It depends on how long and steep the driveway is, how much clearing the route needs, how many culverts it takes and how much gravel goes on it. We walk the route with you and give you a free written quote, so you know the price before we start.

What kind of driveways do you build?

Gravel driveways and roads. Each one gets a cleared route, a graded road bed, drainage and a gravel finish.

Why does my gravel driveway keep washing out?

Almost always, water is running down the driveway instead of off of it. Reshaping the surface, cutting ditches along the high side and adding culverts where the water crosses usually stops it.

Can you fix the driveway I already have?

Yes. We can regrade a rough or rutted drive, add the ditches and culverts it's missing, and put down fresh gravel.

Do I need a culvert?

If water crosses the route anywhere, from a ditch, a low spot or a spring, a culvert carries it under the driveway. When we walk the route, we'll show you where the water goes and where a culvert makes sense.

Should the driveway go in before the house?

Usually, yes. A driveway gets the builder's trucks and equipment in, so we often build it right after clearing and before the house pad is finished.

How do I get a quote?

Call 828-550-9062 or send us the quote form. We'll come walk the route with you and send you a free written quote, with no charge for the visit.

Our Other Services

Call Now